Bristol Water Headquarters, Bristol

Refurbishment and extension of commercial premises by steel frame construction.

Bristol Water’s 1960’s headquarters has recently undergone a major face lift in the form of a steel frame extension and internal refurbishment and fit out.

The aim was to increase facilities on site with a cost effective design, small carbon footprint and high energy efficiency.

KB2 undertook the structural and civil design of the over cladding of the existing building and the major new three storey steel framed extension.

Photographs: Story Photography
Design: gcp Chartered Architects